Transition Networks SMHB-TR-16 Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 54
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
2. Site Planning
Site planning for the StackMasterTR Stack requires consideration both of
site conditions and of token ring standards.
2.1 Site Considerations
The site for the StackMasterTR Token Ring Stack must provide the
following:
AC power outlet for each StackMasterTR Unit
Adequate ventilation
Standard environmental conditions
Isolation from electrical noise, including radio transmitters and
broadbank amplifiers, motors, high power electrical lines, or
fluorescent light fixtures
Additionally:
The token ring cables should not run in the same conduit with power
line cables.
Phone lines should be separated from data cables.
Flat or “silver satin” wires should not be used.
2-1
USER’S GUIDE
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 53 54

Comentarios a estos manuales

Sin comentarios